top of page

BUNNINGS YARRAWONGA

Successfully completed during the COVID-19 pandemic in 2020, the Bunnings Yarrawonga project consisted of the construction of a two storey structure comprising of undercover parking on the lower level and the upper level being the 9000m2 main retail space.

Airducter manufactured, supplied, installed and commissioned ducted air conditioning to the administration area and lunch room, as well as a mechanical exhaust ventilation system to the Timber Trade area, toilets, airlocks, and the change rooms and amenities area. We supplied and installed split air conditioning systems to the training room, on-line learning room, café, communications room, and the DIY area, as well as ventilation fans to the nursery entry, main entry and travelator. 

Airducter worked closely with numerous internal stakeholders to ensure the smooth running of the project during a pandemic. This resulted with Airducter delivering the project on time and on budget with zero Worksafe incidents.

Project Gallery

bottom of page